Constant temperature and humidity test chamber daily maintenance and maintenance
1.the ground around the fuselage and the bottom should be kept clean at any time;

2. the machine should first remove the internal impurities before operation; The laboratory should be cleaned at least once a year;
3.the product must be taken and placed in the shutdown state;
4.half a year inspection of all copper pipe leakage and other conditions, the functional joints, welding, if there is oil leakage, must be dealt with immediately;
5. The condenser should be maintained regularly and kept clean. Dust sticky condenser will make compressor high pressure switch trip and produce false alarm, condenser should be regularly maintained every month.